top of page
WHY IT MATTERS
Poor rostering turns good planning into operational failure.
-
Duties left uncovered or unevenly distributed
-
Working hour limits and legal rules difficult to track
-
No visibility into workload fairness before live plan
-
Gaps here don't show up until fails occur in the field
HOW IT WORKS
From scheduling outputs to a ready-to-run workforce plan
01
Define your roster structure
Cermoni creates a roster project using scheduling outputs, driver availability, off-day rules, working hour limits, overtime rules, and backup requirements — all configurable through the interface.
02
Generate and review the plan
The system produces an optimized roster based on your parameters. Planners can review the full picture — working hours, overtime, off-days, and duty distribution — before anything is finalized.
03
Assign drivers and finalize
Once the structure is confirmed, real driver names and vehicle plates are assigned to generated IDs. Duties can rotate weekly or over longer cycles to keep workloads balanced across the team.
KEY CAPABILITIES
Everything you need to plan smarter
.png)
.png)
Editable Roster Planning
Start from an optimized plan, adjust when needed
Cermoni generates an optimized roster as a starting point. Planners can manually edit assignments, adjust specific duties, and apply local operational preferences directly through the interface.
Edit assignments and duties after optimization
Apply local preferences without rebuilding the whole plan
Combines algorithm output with operational experience
Fair Workload Distribution
Balance duties across your entire driver pool
Rotating duty structures ensure drivers move across different assignments over weekly or multi-week cycles — so heavy and light duties are distributed evenly and no one is consistently overloaded.
Rotating duty structures across weekly or multi-week cycles
Tracks working hours, overtime and off-days per driver
Gives planners a clear view of workload fairness
.png)
.png)

.png)
Period-Based Planning
Plan for the full season, not just the next week
Rosters are built for full operational periods — school season, summer season, or any defined horizon. Special days such as public holidays and events can also be factored in, so the plan holds up across the entire period.
Full period roster projects for any planning horizon
Special days and exceptions factored into the plan
Consistent application across the selected operating period
REFERENCES
What teams achieve with Cermoni
Real results from transport authorities and operators who shifted from manuel to digital public transportation planning.
See how cities use Cermoni to turn data into better operations.
Read all the case studies
bottom of page
