top of page

Build driver rosters around efficiency, fairness and compliance

Cermoni turns your schedule into a complete workforce plan — assigning duties, rotating shifts, and respecting every working rule before operations begin.

WHY IT MATTERS

Poor rostering turns good planning into operational failure.

  • Duties left uncovered or unevenly distributed 

  • Working hour limits and legal rules difficult to track

  • No visibility into workload fairness before live plan

  • Gaps here don't show up until fails occur in the field

HOW IT WORKS

From scheduling outputs to a ready-to-run workforce plan

01

Define your roster structure

Cermoni creates a roster project using scheduling outputs, driver availability, off-day rules, working hour limits, overtime rules, and backup requirements — all configurable through the interface.

02

Generate and review the plan

The system produces an optimized roster based on your parameters. Planners can review the full picture — working hours, overtime, off-days, and duty distribution — before anything is finalized.

03

Assign drivers and finalize

Once the structure is confirmed, real driver names and vehicle plates are assigned to generated IDs. Duties can rotate weekly or over longer cycles to keep workloads balanced across the team.

KEY CAPABILITIES

Everything you need to plan smarter

Cermoni Website Görseller 2026 (18).png
Cermoni Website Görseller 2026 (17).png

Editable Roster Planning

Start from an optimized plan, adjust when needed

Cermoni generates an optimized roster as a starting point. Planners can manually edit assignments, adjust specific duties, and apply local operational preferences directly through the interface.

Edit assignments and duties after optimization

Apply local preferences without rebuilding the whole plan

Combines algorithm output with operational experience

Fair Workload Distribution

Balance duties across your entire driver pool

Rotating duty structures ensure drivers move across different assignments over weekly or multi-week cycles — so heavy and light duties are distributed evenly and no one is consistently overloaded.

Rotating duty structures across weekly or multi-week cycles

Tracks working hours, overtime and off-days per driver

Gives planners a clear view of workload fairness 

Cermoni Website Görseller 2026 (18).png
Cermoni Website Görseller 2026 (27).png
Cermoni Website Görseller 2026 (29).png

Period-Based Planning

Plan for the full season, not just the next week

Rosters are built for full operational periods — school season, summer season, or any defined horizon. Special days such as public holidays and events can also be factored in, so the plan holds up across the entire period.

Full period roster projects for any planning horizon

Special days and exceptions factored into the plan

Consistent application across the selected operating period

REFERENCES

What teams achieve with Cermoni

Real results from transport authorities and operators who shifted from manuel to digital public transportation planning.

Adsız tasarım (14).png

Vignola,
Italy

Fleet reduction without
service cuts

Otobüs Durağı (9)_edited.jpg

Antalya,
Türkiye

Right-sizing a large
urban network

wp13852676.jpg

Makkah,
Saudi Arabia

Eelctric Public
Transport Planning

See how cities use Cermoni to turn data into better operations.

Read all the case studies

EXPLORE OTHER FEATURES

Timetable

Demand based timetable

Scheduling

Vehicle&driver assignment

Advanced analysis

OD, occupancy & performance

GTFS data management

Standard format & publishing

See what Cermoni can do for your operations

Request a demo to see the impact for yourself

bottom of page